- A replacement frame has to be smaller than the opening it enters, and the allowance is set by how the frame will be aligned, packed and sealed, not by the manufacturing tolerance of the frame itself.
- Record the smallest width and height at several points plus both diagonals: a masonry opening that is out of square by more than the alignment allowance will force either a smaller frame or a rebuilt reveal, and that decision belongs before the order, not on site.
- Frame-in-frame is faster and less disruptive but it adds a second frame, a second perimeter joint and a second drainage path, and it cannot repair a cold bridge or a failed cavity closer that sits behind the old frame.
- The installed U-value of a replacement window is not the number on the product label: the junction at jamb, head and sill is a separate linear loss and is usually the largest single penalty in a retrofit.
- Improved glazing moves the coldest internal surface from the glass to the frame and the reveal, so a project that replaces glass and leaves the junction alone trades a draught complaint for a mould complaint.
- If the original sill is retained, the new frame's drainage outlets must discharge to the outside face and not into the wall or behind the cladding, and sealant must never be used to close a weeping path.
- The airtightness layer has to be continuous with the wall's own layer; expanding foam and a sealant bead are not an airtightness strategy, they are a gap filler with a service life shorter than the window.
- Replacement work is a scope problem as much as a technical one: making good, disposal, access, temporary weathertightness and the condition of the existing structure have to be priced or excluded in writing.
1. Replacement Inverts the Design Problem
Almost every fenestration guide is written for a new opening in a new wall. In that case the frame is the fixed object: it is manufactured to a tolerance of a millimetre or two, delivered to site, and the structure is expected to accommodate it, with the gap between frame and structure taken up by packers, a compressible joint and a seal. The building is the variable, and the specification controls it through the sequence of setting out, first fix and inspection.
Replacement work inverts the relationship. The opening exists. It was built to a structural tolerance far looser than a factory frame, it has been in service for decades, it may have been altered, and it is bounded by finishes that belong to somebody else and that somebody expects to keep. The frame is now the variable, and the information that matters is not the product catalogue but the condition of the hole.
That inversion produces three failure modes, and they are the same three in every market. Water arrives where the old sill no longer drains. Air leaks where the new frame meets an airtightness layer it was never detailed against. Cold shows up as condensation on a reveal that was already the coldest surface in the room, because the cold path through the wall was never the window's business and still is not.
None of those three are solved by choosing a better window. They are solved by surveying the opening properly, deciding honestly whether the existing frame and reveal can stay, and detailing the junction as a designed assembly rather than as a gap to be filled on the day. The rest of this guide works through that sequence in the order a project actually meets it.
2. What the Survey Has to Record Before Anything Is Quoted
A replacement quotation issued from a single width and height is a guess with a price attached. The survey exists to convert the opening into a set of decisions, and the decisions are only as good as the record. What follows is the minimum set for a residential or low-rise commercial replacement, and every item on it has a cost attached somewhere downstream.
Dimensions, measured properly. Width and height at the head, mid-height and sill, on both the internal and the external face, because a reveal that is not parallel to the wall face is common and a frame sized to the average will not fit the narrow end. Both diagonals of the structural opening, because equal diagonals are the only quick evidence that the opening is square. For masonry, note whether the reveals are plastered, rendered, drylined or fair-faced, since the finished opening size is what the frame is set against, not the structural one.
Reveal depth on both faces. The distance from the wall face to the frame position inside the opening, internally and externally. This decides whether the frame can sit at the insulation line, whether an internal sill board or window board can be retained, and whether the external reveal is deep enough to shed water clear of the frame. It is also the dimension that most often kills a frame-in-frame scheme, because the new frame needs depth that the old one was not using.
Wall construction and the cold path. Cavity, solid, timber frame, insulated render system, single-skin block. Whether there is a lintel and what it is made of: a steel lintel over an opening is a thermal bridge with a much higher conductivity than masonry, and it is often the reason a reveal runs wet in winter. Whether the cavity is closed at the jambs and with what.
The existing sill and the water route. Is the sill a separate stone or concrete unit, a pressed metal cover, a tile, or the frame's own profile. Does it slope outwards. Does it overhang. Is there a visible drip. Where does water that leaves the old frame actually go.
The services and the obstructions. Blinds, shutters, curtain tracks, radiators under the sill, alarm contacts, air-conditioning pipework through the reveal, external render beads, cladding rails. Each of these either constrains the frame position or becomes a variation.
| Recorded item | Why it changes the order | Who it protects |
|---|---|---|
| Smallest width and height, not the average | The frame must clear the tightest point; the average fits nowhere | Both parties, against a remake |
| Both diagonals | Out-of-square beyond the alignment allowance forces a smaller frame or reveal repair | The installer, against a frame that will not sit plumb |
| Reveal depth, internal and external | Sets frame position within the wall, hence thermal performance and water shedding | The client, against a window that cannot drain |
| Lintel type | A steel lintel is a cold path that improved glazing will expose | The designer, against a condensation complaint |
| Existing sill type and slope | Decides whether the sill can be reused and where the new outlets discharge | The building, against a leak at the sill |
| Wall airtightness layer | Determines whether the new frame can be connected to anything continuous | The occupier, against draught and interstitial moisture |
Two practices make the record usable. Photograph every opening with a tape or a scale in frame, and mark up a dimensioned sketch per opening rather than a schedule line, because the exceptions are what cost money. And have the record signed before manufacture: the survey becomes the contractual description of the opening, and a signed survey is the difference between a tolerance argument and a technical fact. Where a project is large enough to justify it, the survey and installation practice described in BS 8213-4, the code of practice for the survey and installation of windows and external doorsets, is a reasonable structure to work to.
3. Frame-in-Frame or Full Tear-Out: the Decision That Sets Everything Else
There are two ways to put a new window into an old opening, and the trade between them is not mainly about money. It is about how much of the existing assembly the new window is allowed to inherit.
Frame-in-frame keeps the perimeter of the old frame and fixes a new, slimmer frame inside it. It is fast, it is clean, it can be done room by room in an occupied building, and it leaves the internal and external finishes untouched because nothing is demolished. It is the standard approach in apartment refurbishment for exactly those reasons.
What it inherits is the problem. The old outer frame stays in the wall, which means the old drainage path, the old cavity closure and the old thermal bridge stay as well. The new frame is fixed to the old frame, so the load path now runs through a component of unknown remaining life: a uPVC frame that has been under ultraviolet load for decades is not the same material it was, an aluminium frame may be corroded at the fixing points, and a timber frame may be sound at the head and rotten at the sill. And the assembly now has two perimeter joints instead of one, an outer joint that still has to keep the weather out and an inner joint that has to be sealed and drained, with the space between them effectively a small cavity nobody has detailed.
There is also a geometric cost that surprises clients. Adding a frame inside a frame reduces the glass area twice, once for the new frame and once for the retained one, and it reduces the depth of the internal reveal, which changes how much light reaches the room and how the window reads in a thick wall. On small openings this is obvious; on large ones it is a slow erosion of the reason the window was there.
A full tear-out removes the old frame completely and restores the opening to masonry. Everything is available again: the cavity can be closed properly, an insulated sub-sill can be fitted, an airtightness membrane can be dressed to the wall, the frame can be positioned at the insulation line rather than wherever the old one sat, and the reveal can be insulated before it is made good. The price is disruption: plaster, render, tiles and sills are cut back, the room is out of use, and the structure behind the old frame is revealed for what it is, which occasionally means an unplanned lintel or a missing cavity tray.
| Criterion | Frame-in-frame | Full tear-out |
|---|---|---|
| Disruption to finishes | Minimal; internal and external surfaces usually retained | Reveals, sills and adjacent finishes cut back and remade |
| Time per opening | Short, and separable room by room | Longer, and weather-dependent |
| Glass area | Reduced by the retained frame as well as the new one | Set by the opening, so no double loss |
| Perimeter joints to seal and drain | Two, with an undetailed cavity between them | One, which can be detailed as designed |
| Thermal bridge at the reveal | Inherited unchanged | Can be reduced with insulation and frame position |
| Airtightness | New joint to old frame; old frame to wall left as found | New continuous layer to the wall's own layer |
| Condition of hidden structure | Not examined | Examined, and repairable |
| Best suited to | Sound frames, low performance uplift expected, occupied buildings | Failed frames, cold or damp reveals, a real performance target |
The defensible rule is that frame-in-frame is chosen when the performance target is modest and the existing frame is demonstrably sound, and a full tear-out is chosen whenever the project has a thermal, airtightness or water objective that the old perimeter cannot meet. Choosing frame-in-frame to save disruption while promising a thermal upgrade is the single most common way a replacement programme fails to deliver what it was sold as.
4. The Thermal Bridge You Inherit at the Reveal
A replacement window is bought on a whole-window U-value, and that number describes the product, not the hole. The product figure includes frame, glass, spacer and, in a good schedule, the effect of the installation method through a linear thermal transmittance at the junction. In a retrofit, the junction is the part nobody controls, because the wall around it was built before anybody cared.
The physics is simple enough to state without numbers. Heat leaves a building through the frame, through the glass and through the junction where the frame meets the wall. The junction is narrow, but the path through it is short, and in a masonry or concrete reveal the path is also relatively conductive. Add a steel lintel at the head and the path becomes a fin. The result is an internal surface at the jamb, head or sill that runs colder than either the glass or the field of the wall, and a cold surface in a warm humid room is where condensation starts.
This is why a replacement programme can make a room feel better and make a wall look worse. The old single-glazed window was the coldest surface in the room, so it collected the condensation where it could be wiped off. New glazing removes that surface, and the coldest point migrates to the frame and then to the reveal, which is a porous, painted, often wallpapered surface that cannot be wiped. The complaint arrives in the first cold season and it is not a window fault, although it will be reported as one.
The countermeasures are all about position and continuity. Setting the frame further back into the reveal, towards the insulation line rather than flush with the external face, brings the frame into a warmer zone and shortens the cold path. Insulating the reveal itself, where depth allows, removes the cold surface from the room side. Where a steel lintel is the bridge, an insulated lining over it on the warm side, or a proprietary thermal break, is the only real answer. Where none of that is possible, mechanical ventilation or controlled humidity may be the pragmatic response, and the client should hear that at survey stage rather than after occupation.
In hot climates the same geometry reads differently. The problem is not a cold surface but solar exposure: a frame set flush to a west-facing wall absorbs and conducts far more than one sheltered in a deep reveal, and the reveal depth that is a thermal liability in a cold climate is a shading asset in a hot one. The survey conclusion is the same shape, though: the frame position is a design decision about the wall, not a default inherited from the old window. EN ISO 13788, the standard method for assessing internal surface temperature against critical surface humidity and interstitial condensation, is the appropriate framework for testing a proposed detail rather than arguing about it afterwards.
5. Water: the Old Sill, the New Outlets, and Where the Water Actually Goes
Water is the failure that shows up first, and in replacement work it almost always shows up at the sill, because the sill is the one part of the assembly everybody tries to keep.
A window frame is not a sealed box. It is designed to admit a small amount of water past the external seals, collect it in a drained chamber and discharge it through outlets to the outside face. That design assumes the outside face is the external face of the wall, or a position from which water can fall clear. Retain the original sill and that assumption can quietly become false. The new frame's outlets discharge into the space between the old sill and the new frame, or behind a render upstand, or onto the top of a sill that falls the wrong way, and the water then tracks inward under capillary action and appears as a damp patch at the internal floor line, months after handover.
The three details that prevent this are not complicated, but each has to be drawn.
A drained path to the outside face. The frame's outlet slots must be open, unobstructed, and discharging onto a surface that falls away from the building. Where the retained sill is in the way, the outlet must be extended or the sill cut back, and this is a workshop or survey decision, not a site improvisation. Sealant must never be injected into a drainage path: the commonest cause of a leaking replacement window is a bead of mastic in a weep slot.
A back dam and ends. Where the frame sits behind a cladding or render line, the horizontal joint needs a raised back edge and closed ends, so that water arriving at the back of the frame cannot run sideways into the wall cavity. In a full tear-out this is a sub-sill or a formed tray; in frame-in-frame it is often the detail that was never considered.
A capillary break and a drip. A sill that meets a frame face to face without a break draws water inwards by capillary action regardless of how well it is sealed. A projection, a groove or a gasket that interrupts the contact is the break. Below the sill, a drip that projects beyond the wall face keeps water off the wall below, which is why the depth of the external reveal measured at survey matters.
Two related points belong here. Where the exterior is a drained and ventilated cladding or render system, the window must not be allowed to bridge the drainage plane: the wall's water management and the window's are separate systems and must stay separate, with the window's outlets discharging outside the wall's own cavity. And where the new frame sits inside the old one, the cavity between the two frames is a small, undrained, unventilated space. It should be filled and sealed rather than left, because a void between two frames is a place where water collects and never leaves.
6. Air: the Airtightness Line Is a Layer, Not a Bead
Air leakage in a replacement window is rarely the window. It is the perimeter, and specifically the fact that the new frame has been connected to a wall that has no continuous airtightness layer to connect to.
A frame is sealed to the opening in two different senses, and confusing them is the source of most failures. The weather seal keeps liquid water and driving rain out, and it lives on the external side. The airtightness layer stops air movement through the junction, and it may live anywhere in the depth of the reveal, provided it is continuous. A bead of sealant on the internal face does both jobs badly: it is exposed to movement, it adheres to whatever dust and paint happened to be there, and it is applied at the end of the job by somebody with no reason to know where the line should run.
What the line has to do is join the frame to the wall's own airtightness element, whether that is plaster, a vapour control layer, a sheathing board or a parge coat. That joint is a designed component. Pre-compressed joint tape, a liquid-applied membrane with a reinforcing mesh, or a taped membrane dressed from frame to substrate are the usual answers, and each has a substrate it will not stick to. Tapes do not bond to dusty masonry, to damp render, or to a painted surface that is about to fail; membranes need a clean, sound, dry substrate and a primer where the manufacturer requires one. The survey should record what the substrate actually is at each face, because that record decides the method and the method decides the price.
Expanding foam is the material that gets used instead, and it is worth being precise about what it does. A polyurethane foam fills a gap, reduces convection inside that gap and provides some thermal resistance. It is not an airtightness layer, it does not bond reliably to both faces over the long term, and it is not a vapour control layer. It can be part of a joint; it cannot be the joint.
In frame-in-frame work the question is sharper still. The new frame can be sealed to the old frame, but the old frame's own junction to the wall is unchanged, and that junction has been leaking since it was built. Sealing the inner joint while leaving the outer one open creates a small cavity fed by outdoor air, which is worse than the original condition in one respect: the cavity now sits between two frames where it can condense on the cold side and drain nowhere. If the outer perimeter cannot be made good, that limitation should be written down rather than covered up with foam.
Airtightness failures rarely present as draughts in a well-insulated room. They present as a cold patch, a damp corner, or mould in a check reveal, because the air that leaks carries moisture that condenses on the first cold surface it meets. That is why the junction is worth more attention in the specification than the frame's own leakage class, which in a factory-made product is usually the least uncertain number in the assembly.
7. Working in an Occupied Building: Sequence, Protection and Making Good
Replacement work is usually done in buildings that are in use, which turns a technical exercise into a programme. Three things follow, and each has a cost line attached.
Temporary weathertightness. An opening without a window is a hole, and a hole is a risk with a schedule. Each opening needs a defined period between removal and glazing, a temporary closure that can resist wind and rain rather than a plastic sheet, and a decision about who owns the risk if the weather turns. Where a room cannot be emptied, the sequence has to allow the old frame to stay until the new one is on site and checked, which usually means frame-in-frame or a very disciplined delivery schedule.
Protection of what is being kept. Floors, stair nosings, kitchen units, sanitaryware, soft furnishings and, in commercial work, stock. Dust from cutting masonry and render travels further than expected, and the fine fraction settles on surfaces that are hard to clean. Lifts and stair cores need protection because a 2.4 m frame does not turn a corner, and a route survey belongs in the scope: the day a frame cannot reach the room is the day the programme slips.
Protective film. Most factory-finished frames arrive wrapped in a protective film, and the film has a service life in sunlight. Left on a south elevation through a hot week, an ordinary PVC film can bond to a powder-coated or anodised surface and leave adhesive residue that no solvent will remove without dulling the finish. Removal timing is therefore a real instruction, not a housekeeping note, and it belongs in the handover pack: film off as soon as the frame is fixed and the adjacent wet trades are finished, and certainly before the elevation is exposed to direct sun for any length of time.
Phasing has a technical consequence too. Replacing windows one elevation at a time, or one room at a time, produces a building that is partly new and partly old for weeks. During that period, ventilation, humidity and heating behave unpredictably, and any condensation that appears is likely to be blamed on the new windows. Photographing the reveal condition before the work starts is the cheapest protection against that argument.
Finally, making good. Cutting back plaster, render, tiles and sills is unavoidable in a tear-out and the finish standard has to be agreed in advance: who fills, who paints, who replaces the window board, who matches the render texture, and what is excluded. A replacement contract that is silent on making good is a contract that will end in a dispute about a plasterer's invoice.
8. The Scope and Acceptance List, and When Retrofit Is the Wrong Answer
A replacement package is a set of interfaces, and interfaces are where scope disputes live. The following list is short enough to attach to a purchase order and specific enough to be enforceable.
- Survey record per opening, signed before manufacture, including the smallest width and height, both diagonals, reveal depth on both faces, wall and lintel construction, existing sill type and fall, services in the reveal, and the substrate at each sealing face.
- Installation method per opening: frame-in-frame or tear-out, the alignment and packing method, the airtightness method and the material it bonds to, the drainage discharge point, and the thermal position of the frame within the reveal.
- Explicit inclusions and exclusions: making good internally and externally, window boards, blinds and shutter boxes, removal and disposal of the old frames and glass, access equipment, temporary closures, out-of-hours working, and the treatment of any substrate found to be unsound.
- Tolerances written down: the maximum permissible deviation from plumb, level and square at handover, and the maximum gap at any point of the perimeter joint, so that the acceptance inspection has a criterion rather than an opinion.
- Verification: a visual and functional check of every sash and door leaf, of every drainage outlet for obstruction, and of the continuity of the airtightness line at a sample of openings, recorded with photographs before the reveal is closed.
- Film removal and cleaning, with the instruction on site and in the handover pack, and a documented handover of hardware adjustment and maintenance.
Two situations deserve a straight answer rather than a workaround. The first is a wall with no continuous airtightness layer and a shallow, uninsulated reveal: a replacement window can improve the glass and still leave the room cold, damp and draughty, and the honest recommendation is to treat the junction as part of the scope or to say plainly that the target will not be met. The second is an opening whose condition is unknown until the old frame comes out. Where the structure is suspect, the programme needs a hold point and an inspection, because discovering a failed lintel after the frames are manufactured converts a planned cost into an emergency one.
None of this makes replacement work complicated in principle. It makes it a survey-led activity in which the window is the easy part. The projects that go well are the ones where somebody measured the hole properly, decided what the new frame was allowed to inherit, and drew the three junctions, at head, jamb and sill, before the order went in.