Embodied Carbon in Window and Door Specifications: Reading a Fenestration EPD, Normalising the Functional Unit and Comparing Aluminium, uPVC and Timber Without False Like-for-Like

White uPVC sliding window with a white outer frame, one large fixed pane and two sliding sashes with recessed white pulls, shown against a plain white background
White uPVC sliding window with a white outer frame, one large fixed pane and two sliding sashes with recessed white pulls, shown against a plain white background
Key Architectural Takeaways
  • An EPD is a declaration about a scenario, not a measurement of the product. Two declarations can only be compared when the PCR, the declared unit, the module set and the reference service life all agree.
  • Module D is reported separately in EN 15804+A2 and is not netted into the A to C totals, so a headline figure that quietly includes end-of-life credits is not comparable with one that does not.
  • Per square metre of aperture, a small window carries a much larger share of frame than a large one - roughly a fifth of the opening against a tenth in the arithmetic below - so a single declared unit cannot be applied across a mixed schedule without correction.
  • Per kilogram, primary aluminium carries the heaviest burden of the common frame materials; but the frame is rarely the whole mass, and glass, steel reinforcement and hardware each bring their own supply chain into the total.
  • Fabrication yield is a real and frequently ignored line: off-cut rates, remade units and packaging decisions land in the declared modules and are among the few variables a buyer can actually influence at award.
  • Embodied carbon says nothing about durability, maintenance intervals or thermal performance. A frame that saves material in production and loses it in operation, or needs replacing inside the building life, is not the lower-carbon choice at building level.

1. Why a Carbon Column Appeared in the Window Schedule

For most of the last two decades a fenestration schedule carried performance and nothing else: thermal transmittance, acoustic rating, watertightness class, wind-load class, security class, finish and glazing build. A growing share of European and North American projects now carries a second column, and it asks for a mass of carbon dioxide equivalent per square metre of window. It arrives from three directions at once. Clients with a published carbon budget apply it to their whole portfolio rather than to one flagship building. Planning authorities in several markets ask larger projects to submit a whole-life carbon statement alongside the energy statement. And green-building rating systems increasingly award credit for material transparency rather than for the choice of a particular material, which shifts the question from which material is greener to can you document what you supplied.

The consequence for a fabricator or an importer is straightforward and slightly uncomfortable: the figure is now a commercial document, quoted in tenders, carried into the client's building model and occasionally used as a pass or fail criterion. It is also, in most schedules, requested without the four attributes that make it meaningful - the standard it was declared under, the declared unit, the modules included and the reference service life. A number without those four is not a comparison. It is a slogan with units attached.

This guide is written for the specifier and the buyer rather than for the LCA practitioner. It does not attempt to teach life-cycle assessment. It attempts to make the declaration legible in a tender review, so that the carbon column can be interrogated in the same way as the watertightness class - by asking what exactly was tested, on what configuration, and by whom.

2. An EPD Is a Declaration About a Scenario, Not a Property of the Product

A U-value is a property. You can test it, it belongs to the product, and it does not change when the product is shipped to a different country. An environmental product declaration is a different kind of object. It is a Type III environmental declaration, prepared under EN ISO 14025, built from a life-cycle assessment carried out to the EN ISO 14040 and 14044 framework, and structured by a product category rule. The product category rule for windows and pedestrian doorsets in Europe is EN 17213, which is itself a complementary rule sitting under the general construction-products PCR. What the declaration reports is the modelled environmental performance of a declared product, over a declared life, under declared scenarios.

That distinction is the source of nearly every misleading comparison in the market. The transport module depends on where the factory is and how the goods travel, so the same window made in one country and sold in two others can carry two different declarations that differ only in freight. The end-of-life module depends on the waste regime assumed, which is a national or regional assumption rather than a product property. The use-stage modules depend on a maintenance interval that the manufacturer declares, not one that the building will necessarily follow. And the whole declaration rests on a reference service life, which converts a one-off material quantity into an annualised figure and therefore scales the answer.

Two declarations are comparable when, and only when, four things agree: the product category rule and its version, the declared unit, the set of modules reported, and the reference service life. Where any of the four differs, the difference in the headline number contains a methodological difference and a physical one, and the buyer has no way to separate them. A supplier who answers the question by offering a lower number without offering those four attributes has not answered the question.

3. The Module Map: What a Window Declaration Covers

EN 15804+A2 divides a product life cycle into lettered modules, and reading a declaration means reading which of them are populated. The product stage covers raw material supply, transport to the factory and manufacturing. The construction process stage covers transport to site and installation. The use stage covers use, maintenance, repair, replacement, refurbishment and the operational energy and water of the product itself. End of life covers deconstruction, transport, waste processing and disposal. Module D sits outside the system boundary and reports the net loads and benefits of reuse, recovery and recycling potential.

In practice, most fenestration declarations on the market are cradle-to-gate with a few optional modules, which means they stop at the factory gate and say nothing about freight, installation or end of life. That is a legitimate format and it is the cheapest to produce, but it silently excludes exactly the parts of the life cycle that differ most between a domestic supplier and an exporter. A cradle-to-gate declaration from a factory two hundred kilometres away and one from a factory on another continent are indistinguishable in the A1 to A3 modules; the difference appears in transport, and transport is the module most often left out.

The table below is the working map. It is worth carrying into a tender clarification meeting, because the single most common failure in a carbon comparison is a cradle-to-gate figure placed next to a cradle-to-grave figure without a note.

ModuleWhat it covers for a window or doorTypical status and what to watch
A1 to A3Raw material supply, inbound transport, extrusion or fabrication, glazing, hardware, packaging manufactureUsually declared. Check whether the aluminium figure assumes primary or recycled input, and whether reinforcement steel is inside the boundary.
A4Transport of the finished unit to siteOften omitted. Depends entirely on distance and mode; sea freight and road freight are not interchangeable assumptions.
A5Installation, including packaging waste and site lossesOften omitted or declared with a default waste factor that may not match the project.
B1 to B5Use, maintenance, repair, replacement, refurbishmentRarely declared in full. Replacement matters more than it looks: a window replaced once inside a sixty-year building life carries a second product stage.
B6 and B7Operational energy and water of the productFor a passive envelope product this is normally handled at building level, not in the product declaration. Do not read its absence as zero.
C1 to C4Deconstruction, transport, waste processing, disposalDepends on the waste scenario assumed. Aluminium, PVC-U, steel and glass have very different recovery routes.
DNet benefits and loads beyond the system boundaryReported separately and not netted into A to C. A headline figure that includes D is not comparable with one that does not.

One further trap sits inside A1 to A3: the declaration may be product-specific or representative of a product family. Programme rules allow averaged declarations across a group of similar products, which is a legitimate and useful format for a fabricator with hundreds of configurations, but it means the number describes a family average rather than the unit on the drawing. Where the schedule also specifies a heavier reinforcement, a thicker profile or a triple-glazed build than the family average, the declaration is no longer describing what will be delivered.

4. The Functional Unit Is Where Most Comparisons Break

A declared unit of one square metre of window sounds unambiguous until two suppliers interpret the square metre differently. Does it include the frame only, or the frame with glazing? Is it measured over the outer frame, over the structural opening, or over the glazed area? Is it per unit, per square metre, or per kilogram of product? All three appear in the market, and all three answer different questions. Per kilogram is a material question. Per unit is a purchasing question. Per square metre of aperture is the only one that can be multiplied by a schedule and added to a building total.

The reason this matters more for windows than for most products is the frame-to-glass ratio. A window is a perimeter product: the frame runs around the opening, so its area scales with the perimeter while the glazed area scales with the square of the size. Small openings therefore carry a much higher frame share per square metre than large ones, and since frame materials are generally the more carbon-intensive part of the assembly per kilogram, a schedule of small windows will legitimately produce a worse figure per square metre than a schedule of large ones.

The illustrative arithmetic is easy to reproduce. Take a frame face width of 70 mm and ignore the corner detail. A 1.2 m by 1.2 m window has 1.44 square metres of aperture and a perimeter of 4.8 m, so the frame occupies roughly 0.32 square metres, or about 22 per cent of the opening. A 2.4 m by 2.4 m window has 5.76 square metres of aperture and a perimeter of 9.6 m, so the frame occupies roughly 0.65 square metres, or about 11 per cent. The frame share nearly halves on the larger unit while the performance per square metre improves, and neither of those changes comes from the material. They come from geometry.

The reference service life does the same thing in the time dimension. A declaration based on a thirty-year life and one based on fifty years describe different annual burdens from the same material quantity, and neither is wrong - they are simply answering different questions. Where a project's own whole-life assessment assumes a service life that differs from the declaration, the product figure has to be re-annualised before it enters the building model, and that conversion should be stated rather than assumed.

The practical rule for a schedule review is to convert everything to one basis before comparing anything: one square metre of aperture, per year, over a stated service life, with a stated module set. Any supplier who cannot or will not restate their figure on that basis is being asked a question their declaration was never designed to answer, which is itself useful information about how the number was produced.

5. Mass and Carbon: Where They Actually Sit

Buyers tend to assume the frame dominates, because the frame is what they specify. The mass says otherwise. Glass is heavy: at a density of about 2,500 kilograms per cubic metre, a square metre of 4 mm glass weighs roughly 10 kilograms, so a double-glazed unit with two 4 mm panes is around 20 kilograms per square metre before the spacer and the sealant, and a triple-glazed unit is half again as much. On a large fixed light, the glazing is the majority of the delivered mass. On a small opening, the frame and its reinforcement take over. Which material dominates therefore depends on the schedule, not on the product family.

Per kilogram, the frame materials are not equal. Primary aluminium is produced by electrolysis and is electricity-intensive, so its cradle-to-gate burden per kilogram is the highest of the common frame materials by a wide margin. Fabricated PVC-U sits far below it, because the resin is a chlorine and ethylene chemistry rather than an electrolytic metal, and the profile is filled and modified rather than pure polymer. Steel sits in between, below aluminium but above PVC-U per kilogram. Timber carries a low fossil burden in production but brings a separate accounting question, described below. Those rankings are stable and well established; the point for a buyer is not the ranking but the consequence, which is that a small change in aluminium mass is worth more than a large change in PVC-U mass.

That is why recycled content is the single most consequential question in an aluminium frame. The declaration states the input assumption, and the difference between a primary ingot and a secondary ingot is large enough to reorganise a comparison. Two cautions apply. First, pre-consumer and post-consumer scrap are not the same claim, and the declaration should be read for which one is counted. Second, recycled content claimed on a mass-balance or book-and-claim basis describes a purchasing arrangement rather than the physical billet that was extruded; that is an accepted accounting method, but it is not the same statement as verified post-consumer content in the delivered profile, and a buyer comparing two suppliers should compare like with like.

Steel reinforcement is the quiet variable in a uPVC system. A galvanised steel box inside the sash and frame is there for structural reasons, and it carries a higher burden per kilogram than the PVC around it, so two profiles of identical appearance can differ materially in declared carbon depending on whether reinforcement is specified in the sash only or in both frame and sash, and on the wall thickness of the reinforcement box. A uPVC declaration that omits the reinforcement from the boundary is describing a product that is not being sold.

Timber needs its own paragraph because its accounting differs. Wood stores biogenic carbon as it grows, and EN 15804+A2 reports that as a separate biogenic indicator rather than folding it into the fossil figure. The convention is that the biogenic carbon removed from the atmosphere is reported as a negative value at the point the material enters the product, and the end-of-life release is reported in the end-of-life modules, so the two cancel over a full life cycle unless the material is landfilled or the building outlives the accounting period. A timber window declaration quoting an attractive negative headline is usually quoting the entry side of that loop. Whether the loop closes depends on the end-of-life scenario, which is exactly the module that is most often missing. Preservative treatment and the aluminium cladding on a clad-timber system also add burden that a bare-timber figure does not contain.

Glass and hardware complete the picture. Float glass carries the energy of melting, partly offset by cullet in the batch, and the coating, the cavity gas and the spacer are small in mass but not zero. Hardware is small in mass and high in burden per kilogram, since it is plated, machined and assembled from several metals. None of these are reasons to prefer one system; they are reasons to insist that the boundary is stated, because a comparison that excludes glazing or hardware is not comparing windows.

6. What a Factory Can Actually Change

From the buyer's side the useful question is not which material is lower carbon in the abstract - the honest answer is that it depends on the schedule, the grid and the recovery route - but which decisions inside a fixed product family move the declared figure. There are six that matter, and they are all visible in a factory audit or a document review.

  • Input material. Recycled aluminium content, the choice between primary and secondary billet, and the alloy and temper selected. This is the largest single lever in an aluminium system and the smallest in a PVC-U one, where the resin source is usually fixed by the profile supplier rather than the fabricator.
  • Material quantity per unit of performance. Wall thickness in the profile, the size of the reinforcement box, and the number of chambers are all mass decisions. A heavier profile that meets the same thermal and structural requirement at a larger mass is not automatically the better engineering choice, and it is never the lower-carbon one.
  • Glazing build. Cavity count, pane thickness and coating set change glass mass directly, and glass is a large share of delivered mass on most commercial schedules. Triple glazing buys operational energy and costs embodied carbon; the trade is real and should be made explicitly rather than by default.
  • Fabrication yield. Bar optimisation, off-cut rates, remakes and rework are manufacturing waste that lands inside the declared manufacturing module. A fabricator who tracks cut yield and remake rate has a lever here that a fabricator who does not cannot pull. This is one of the few variables an importer can influence by choosing a supplier rather than a material.
  • Finish. Powder coating, anodising and laminating differ in process energy and in the chemistry of the pre-treatment line. The difference per square metre is modest next to the metal itself, but it is not nothing, and the finish also determines how long the frame lasts, which brings the use stage back into the argument.
  • Logistics and packaging. Freight mode and distance sit in the transport module; crates, foam, film and their disposal sit in the installation module. Consolidating shipments and specifying returnable or recyclable packing are procurement decisions with a measurable line in the declaration.

Notice that five of the six are specification or supplier-selection decisions rather than material-category decisions. That is the practical shape of the subject: within any of the three common systems a well-run supplier with a documented declaration will outperform a poorly-run supplier of the same nominal material, and a tender that compares material names rather than declarations is comparing marketing categories.

7. What to Ask For, and What a Good Answer Looks Like

The questions below are the ones that separate a declaration from a figure. They can be asked in a tender clarification round, and the quality of the answer is usually more informative than the number itself.

QuestionAnswer that supports a comparisonAnswer that does not
Under which PCR and standard was this declared?A named PCR for windows and doors, the EN 15804 version, and the programme operator that registered it.We are ISO 14001 certified, or a figure with no standard cited.
What is the declared unit and the reference service life?One square metre of aperture or one unit, stated explicitly, with the service life in years.Per kilogram, or a life not stated.
Which modules are populated?A module list, with omitted modules named as omitted rather than left blank.Cradle to grave, with no module list.
Is the declaration product-specific or a family average?Family average, with the range of configurations covered and the reference configuration.A family average presented as the figure for the specified unit.
What aluminium input assumption is used?Primary or secondary content stated, with the accounting basis named.Eco aluminium, with no basis.
Is the declaration third-party verified and current?A named independent verifier and a validity period that covers the delivery date.Self-declared, undated, or expired.
Can the figure be restated for this schedule?A recalculation on the project basis, or a clear statement of what cannot be restated and why.A flat refusal, or a new number with no method.

One structural point is worth stating plainly because it is frequently misunderstood in procurement: an environmental product declaration is not a certificate of performance. It says nothing about watertightness, wind load, security or thermal transmittance, and holding one does not imply compliance with the product standard for windows and doors. It is a parallel document about a different question, generated by a different method, verified by a different party. A tender that accepts an EPD in place of a performance declaration has confused the two, and a supplier who encourages that confusion is not helping the project.

A second point concerns timing. Declarations are versioned, and a programme rule can be superseded; when the underlying standard or PCR is revised, existing declarations have a transition window and then lapse. A carbon figure offered in a tender should be checked for its validity date against the delivery date, in the same way a test report is checked. Older declarations are not wrong, but a comparison between a declaration produced under a superseded rule and one produced under the current rule contains a methodological difference that must be disclosed.

8. The Limits: What Embodied Carbon Cannot Tell You

Embodied carbon is one axis of a multi-axis decision, and the most common error in carbon-led procurement is to treat it as a single score that settles the choice. Four limits deserve to be written into the specification note.

It does not measure durability. A product with a lower cradle-to-gate figure that needs replacement inside the building life carries a second product stage, and on a sixty-year building that second product stage can outweigh the original advantage. Because the replacement module is so often omitted from product declarations, this comparison cannot be made from the declarations alone; it has to be made from the maintenance regime the supplier is prepared to commit to, and from evidence of how the product behaves in the climate it is being sold into.

It is not a thermal metric. The lowest-material frame is frequently the thinnest one, and a thin frame with a modest thermal break can lose in operational energy more than it saved in production. The trade has to be calculated at building level, over the building's life, with the energy scenario the project actually has. On a low-rise building in a mild climate the embodied side dominates; on a cold-climate or passively cooled building the operational side usually dominates. Neither answer is universal, and a supplier claiming a universal answer is selling.

It does not describe the local grid or the local waste route. A declaration is built on assumptions about the electricity mix used in manufacturing and about what happens to the product at end of life. Where the project's actual grid and waste regime differ, the product figure is a modelled average rather than a description of this installation. For aluminium this matters less, because the metal recovery route is well established; for PVC-U and for timber it matters more, because the recovery routes are less uniform across markets.

It cannot substitute for the performance schedule. The correct reading of a carbon column is as an additional filter applied after watertightness, wind load, security, acoustic and thermal requirements have been met - not as a criterion that can override them. A window that is lower in embodied carbon and fails the watertightness class on a wind-driven-rain facade is not a lower-carbon window; it is a replacement cost waiting to be incurred, with a second product stage attached.

The defensible position for a specifier, then, is modest and practical. Ask for a declaration rather than a figure. Insist on the PCR, the declared unit, the module list and the service life. Normalise to one square metre of aperture per year before comparing. State the operational and durability assumptions alongside it. And record which modules were omitted, because in a few years, when the client asks why the building's whole-life carbon came out higher than the sum of its material declarations, the omitted transport and replacement modules will be the answer.

MATCHING ARCHITECTURAL SYSTEM

Explore OPPGATE uPVC Windows

Multi-chamber uPVC sliding and casement window systems with customized double/single glazing and security hardware.

View All uPVC Windows Models
uPVC Windows

Planning a Commercial or Villa Project?

Send your window schedules or architectural CAD drawings to the OPPGATE engineering team for a prompt, certified quotation and structural review.

Request an Engineered Quotation
Request a QuoteSend Drawings